Checkoff Sheet MS-2015-00173.tif 01/15/2016 13:11 4024268323 PAGE 01
2009 INTERNATIONAL RESIDENTIAL CODE-
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City. mall prig to Final inspection
218 S 1 S*traet, Bia1r, NE 6800
Eecauso of 11MItatlons cau-sed by the Infeasibility to perform detaliad Inspections whichr would
no Interfere with raroofing work, please indicate compltanco with the following requirement
&g2wIM thie reroofing job,
Property Addrass:
Contractor or Homeownsr(If seif):
Permit#; i � 0 ,� �
Installatlon Date;,,»
YES 0
� The materials and methods of application uasd for recovering or replacing tho existing
roof covering comply with the requirements of the building nada. (R907,1)
ICI PROTECTION INSTALLED: An Ice barrier that conslsts of at least two layers of
i underlayment or of aself-adhering polymer modified bitumen sheet was Inst 184 and
extends at least from the eave's edea to a point at least-24jnches Ii)srde the exterior
wall line oftha building, (R90,2.7.1)
e'TRUGTURAL COMPO' NENTS ARE 60UND:,Thestructural roof components are
capable of suppordhg the roof covo-ring system and the material and equipment loads
that will be encountered during Installation of the roof covering system, (11007.2) �
I
EXISTING COVER t� DVi=q* xlsttng roof covering was removed for one
of the req$ona required by section R807,3 `
i)IS NOT U$,ERU3"tDMETAL OR FLASHING.-,Existing vent flashing, metal edges,
drain outlets,pollars or metal counter-flashing were not relnstall$.d if rusted, (1007.5)
LASHING lNgTALLED,PROPERLY:.Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bltuminous materials are to be adhered shall be pruned prior to lnstallaflon,•(13907.6) X
ig ary I stall Da
4
'Wat&6 of Permit Holder Date
I
i
i
l