Loading...
Checkoff Sheet MS-2014-02472.tif 1 2009 INTERNATIONAL RESIDENTIAL. CODE ! CITY OF-GLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 B le Street, Blair, NE 88008 E Because of limitations caused by the infeasibility to perform detailed Inspections which would RoA interfere with reroofing work,please Indicate compliance with the following requirements following this reroofing job. 1 Property Address: ! �� Contractor or Homeowner(if self) L: Permit#: MS-20 Installation mate. YE NO The materials and methods of application used for rdcoverfng or replacing the existing roof covering comply with the requirements of the building code. (11907.1) CE PROTECTIO I INSTALLED:An Ice barrier that consists of at least two layers of underlayment or of a self-adheringpolymer modified bitumen sheet)Mas installed and extends at least from the eave'sedge to a point at least 24 inches inside the exterior wail line of the building, R905,2.7,I) STRUCTURAL CtSMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) C3 EXISTING COVERING WAS ELAOVEfD: Existing roof covering was removed for one of the reasons required by section 89,07.3 ❑ DID NOT USE RUST D ME' Ai,OR P�.AS�,Ii ;Existing vent flashing,metalges, drain outlets,collars or metal counter-flashing were not reinstalled if rusted. (R907.6) FLASHIN13 INSTALLED PRQP PLY:Flashing shall be reconst'ructed in Mtrashing o whish accordance with approved manufacturer's installation Instructions, eta bituminous materials are to be adhered shall be primed prior to installation. (11907.6) Signa F Pr many Installer Hate UffiSigna�Peolder Y Date i