Checkoff Sheet MS-2014-02472.tif 1
2009 INTERNATIONAL
RESIDENTIAL. CODE !
CITY OF-GLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 B le Street, Blair, NE 88008 E
Because of limitations caused by the infeasibility to perform detailed Inspections which would
RoA interfere with reroofing work,please Indicate compliance with the following requirements
following this reroofing job.
1
Property Address: ! ��
Contractor or Homeowner(if self) L:
Permit#: MS-20
Installation mate.
YE NO
The materials and methods of application used for rdcoverfng or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
CE PROTECTIO I INSTALLED:An Ice barrier that consists of at least two layers of
underlayment
or of a self-adheringpolymer modified bitumen sheet)Mas installed and
extends at least from the eave'sedge to a point at least 24 inches inside the exterior
wail line of the building, R905,2.7,I)
STRUCTURAL CtSMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
C3 EXISTING COVERING WAS ELAOVEfD: Existing roof covering was removed for one
of the reasons required by section 89,07.3
❑ DID NOT USE RUST D ME' Ai,OR P�.AS�,Ii ;Existing vent flashing,metalges,
drain outlets,collars or metal counter-flashing were not reinstalled if rusted. (R907.6)
FLASHIN13 INSTALLED PRQP PLY:Flashing shall be reconst'ructed in Mtrashing o whish accordance
with approved manufacturer's installation Instructions, eta
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
Signa F Pr many Installer Hate
UffiSigna�Peolder Y Date
i