Checkoff Sheet MS-2014-01707.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
2'18 S 16 Street, Blair, NE +68008
Because of limitations caused by the Infeasibility to perform detailed Inspections wu ich would
cements
no Interfere with reroofingwork,please Indicate compliance with the following req
following this reroofing job. i
Property Address: CN S 4W_' _ -- 'f 30 .
Contractor or Homeowner(If self) i
Permit#: MS-20 � ..
Installation Date:
YES NO
( The materials and methods of application used for rdcovedng or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
C3 ICE PROTECTION INSTALLED;An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet waswas installed and
extends least from the eaye's edge to a point at lee t 24 Inches inside the exterior
wall line of the building. (R905.2.7.1}
❑ STRUCTURAL,COMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907,2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8907.3
ID NOT USE RUSTED METAL QR F S ING; Existing vent flashing, metal edges,
` drain outlets,collars or metal counter-flashing were not reinstalled if rusted. (11907.5)
FLASHING INSTAC,(`ED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R9O7.6)
Signa ftmary Installer Dat$ i
Signa�ofer Date