Loading...
Checkoff Sheet MS-2014-01706.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF-BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S ie Street, Blair, NE 88048 Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing world please indicate compliance with the following requirements following this reroofing job. Property Address' - Contractor or Homeowner(if self) : — l� Permit#: MS-20 4— �� Installation Date: - YES/ NO LTJ The materials and methods of applioation used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11947.1) ❑ ICE PROTECTION IN_STAAn ice barrier that consists of at least two layers of undedayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 laches inside the exterior wall line of the building, (11905.2,7.1) STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) 9/ C3 EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 (� DID NUT USE RUSTED METAL.OR FLASHING Existing vent flashing, metal edges, drain outlets,collars or metal counter-flashing were not reinstalled if rusted. (11907.5) i FLASHINQ INSTALLED PROPERLY:.Flashing shah be reconstructed In accordance with approved manufacturer's Installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (R9O7.6) Signa�Oftt ffPPrimary Installer Date iigner bate 3