Checkoff Sheet MS-2014-01704.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to glair City Halt prior to Final inspection
218 S ie Street, Mair, NE 68008
secause of ctions which
lmitations caused wi h reroofing wo k�,Tease Indicthe ilItY toa a comp 1 nceerform dwi hlled thelfollowould
wing requirements
RoA Interfere no
follo_wlng this reroofing job.
property Address:
Contractor or Homeowner(if seM
permit#: MS-20—i _DI'7
installation Date:._ --�-w-�
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
( ❑ ICE PROTECTION INSTALLED:An Ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed an
extends at least fEglm the eave`s aoe to a point at le s_et 241nches inside the exterior
wall line of the bullding. (11905.2,7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are I
capable of supporting the roof covering system and the material and equipment loads i
that will be encountered during installation of the roof covering system. (119072)
[ EXISTING C9YERING WAS REll 0VED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTi=D METAL QR FLASHING: Existing vent flashing, metal edges,
drain outlets,collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLA RING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.8)
L
Aig�64aajt ;��,APrimary installer Dae
Signature�frn�%Holder ���
Date
i
f