Loading...
Checkoff Sheet MS-2014-01702.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF;BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16th Street, Blair, NB 68808 Because of limitations caused by the Infeasibility to perform detailed Inspeatlons which would not Interfere with reroofing work,please Indicate compliance with the following requirements f9ligwing this reroofing job. Property address: Contractor or Homeowner(if self)Permit#-.#: MS-20 (,LA,- 1-7 . Installation Date: I YEY NO tj The materials and methods of application used for r4cc vering or replacing the existing + roof covering comply with the requirements of the building code. (11907.1) ICE PROTECTION INSTAt,I_ED:An lee barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least kgM the eaves edge to a point at least 24 inches lnsrde the exterior wall line of the bultding. (8905,2.7.1) L� STRUCTUR&COMPONENTS ARE SOUND:The structural roof components are capable of suppordhg the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907,3 ❑ DID NOT USE RUSTED ME'T'AL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (8907.5) C3 FLASHI G INSTALLED PROPERLY- Flashing shall be reconstructed in accordance with approved manufacturer's installation Instruotions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (13907.6) j I aigna f primary Installer Date + 4 Date Signature 6fferpAir Holder