Loading...
Checkoff Sheet MS-2014-01297.tif E , 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF-BLAIR REROOFING CHECKOFF SHEET ' Return to Blair City Hall prior to Final Inspection 218 S 18 Street, Blair, NE 58008 Because of limitations caused by the Infeasibility to perform detailed inspections which would acA interfere with reroofing work,please Indicate compliance with the following requirements followingthis reroofing job. Property Address:_ J I I Contractor or Homeowner(If self) Permit#: MS-20�m Installation Rate. _ ��-�`� 9 - YE,T NO 15 ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8007,1) ❑ ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheetwgs In-galled and extends at least from the eave's edge to a point a leas 24 Inches inside the exterior wall line of the building, (11905.2.7.1) ❑ STRUCTURAL.COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8807.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE RUSTED METAL ORP AgING,Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (11907,5) ❑ LASHING INSTALLED PROPERLY; Plashing shall be reconstructad in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) t-'' '" � Signa Primary Installer Dpte Slgnatur of ermit Holder Date