Loading...
Checkoff Sheet MS-2014-01296.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY IC I~:GLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S le Street, Blair, NB 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would aoj interfere with reroofing work, please Indicate compliance with the following requirements foll9wing this reroofing Job. Property Address: I `I S-e14 Contractor or Homeowner(if self): �5 ' Permit#: MS-20 14 -Cd Installation Dat@: A 6>?t YEy NO ,9 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was ingaa lied and extends of least from the eave's edea to a point at least 24 ingbes inside the exterior wall fine of the building. (8906.2.7.1) STRUCTURAL_COMPONENTS ARE SOUND: The structural roof components are capable of supportlhg the roof covering system and the material and equlpment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMQVED: Existing roof covering was removed for one of the reasons required by section 8907.8 DlL3 NOTU$E RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter fleshing were not reinstalled if rusted. (R907.5) FLAS ING NSTA Q PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8507.6) Signature rimary installer bate Signature of ermit Holder [tate _ - f'