Checkoff Sheet MS-2014-01295.tif i
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF SLAIR REROOFING CHECKOFF SHEET
Return to Blair Goth Hall prior to Final Inspection
278 S le Street, Blair, NB 68O08
Because of limitations caused by the Infeasibillty to perform detailed inspectionswhich would
menta
no interfere with reroofing worts,please Indicate compliance with the following
following this reroofing Job.
Property Address: --
Contractor or Homeowner(!f self)
Permit#; MS-20., A
installation mate:
Y,E�S/ NO .
i [ The materials and methods of application of building rode (R907.
treplacing
�#he e�sting
roof covering comply with the requirements
(� ICE PROTECTION INSTALLED'.An Ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheetswa installed and
extends at Least from g eava's edge to a point at least 24 inches inside the exterior
wail line of the buliding, (11905.2.7.1)
STRUCTURAL.COMPONENTS ARE SOUND The structural roof components are
-capable of supportlhg the roof covering system and the materlai and equipment loads
that will be encountered during installation of the roof covering system. (R907,2)
[� EXISTING CO RING 1MAS REMOV�D Existing roof covering was removed for one
of the reasons requited by section R9
7.3
DID NOT USE RUSTI=D '�p►L OR PL S lNO:
Existing vent flashing, metal edges,
drain outlets,collars or metal counter-hashing were not reinstalled If rusted. (8907,5)
[
FLASHING INSTALLED PROPER Y; Flashing shall be reconastruotwhlcd In hordanc's
with approved manufacturer's instaiiatiort instructions. Meta g
to bituminous materials are to be adhered shall be primed prior to Installation, (R907.6)
piate
Stgnatur rimary installer
Slgnat re of Aa- it Holder
pate