Loading...
Checkoff Sheet MS-2014-01295.tif i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF SLAIR REROOFING CHECKOFF SHEET Return to Blair Goth Hall prior to Final Inspection 278 S le Street, Blair, NB 68O08 Because of limitations caused by the Infeasibillty to perform detailed inspectionswhich would menta no interfere with reroofing worts,please Indicate compliance with the following following this reroofing Job. Property Address: -- Contractor or Homeowner(!f self) Permit#; MS-20., A installation mate: Y,E�S/ NO . i [ The materials and methods of application of building rode (R907. treplacing �#he e�sting roof covering comply with the requirements (� ICE PROTECTION INSTALLED'.An Ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheetswa installed and extends at Least from g eava's edge to a point at least 24 inches inside the exterior wail line of the buliding, (11905.2.7.1) STRUCTURAL.COMPONENTS ARE SOUND The structural roof components are -capable of supportlhg the roof covering system and the materlai and equipment loads that will be encountered during installation of the roof covering system. (R907,2) [� EXISTING CO RING 1MAS REMOV�D Existing roof covering was removed for one of the reasons requited by section R9 7.3 DID NOT USE RUSTI=D '�p►L OR PL S lNO: Existing vent flashing, metal edges, drain outlets,collars or metal counter-hashing were not reinstalled If rusted. (8907,5) [ FLASHING INSTALLED PROPER Y; Flashing shall be reconastruotwhlcd In hordanc's with approved manufacturer's instaiiatiort instructions. Meta g to bituminous materials are to be adhered shall be primed prior to Installation, (R907.6) piate Stgnatur rimary installer Slgnat re of Aa- it Holder pate