Checkoff Sheet MS-2014-01047.tif INTERNATIONAL RESIDENTIAL C
2009�9 INT'ERN ODE
CITY OF ,BLA,IR REROOFING CHECKOFF SHEET
Return to Blair City Hall parlor to Final Inap�ecti
218 S i6th street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not Interfere with reroofing work,please Indicate compliance with the following requirements
f I,c Dgwina this reroofing Job.
Property Address:
Contractor or Homeowner(if self)
Permit#: MS-20 t - ,
installation Date: .__._. —�
Yy✓ NO
{� ❑ The materials and methods of application used for rgcavering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
❑ ICE PROTECTION 1NSTA L.ED: An ice barrier that consists of at least two layers
of
undedayment or of a seif-adhering polymer modified bitumen sheet was instal
nd
extends at least turn the eaye's edge to a point at least 24 Inches inside.the exterior
wall line of the building. (R905.2.7.'1)
STRUCTURAL c WPONEEU AsRE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
Q EXISTING C VI=RI WAS REMOVED! Existing roof covering was removed for one
of the reasons required by section R907.3
C3 }}IQ OT USERUSTw METAL OR S NG:--Existing vent flashing, metal edges,
N �'�-�� #rusted. R947.6�
drain outlets,dollars or metal counter-flashing were not reinstalled ( (
I
FLA3H1 iNSTALt.ED P O ERLY: Flashing shat}be reconstructed in accordance
ation Instructions. Metal which
with approved manmaterials are to be adhecturers red bituminous ma shall be primed prior to Ins allation. (R9Q7.6)
Date
Signator Primary installer
Date
Signatur of e i Holder
i