Loading...
Checkoff Sheet MS-2014-01047.tif INTERNATIONAL RESIDENTIAL C 2009�9 INT'ERN ODE CITY OF ,BLA,IR REROOFING CHECKOFF SHEET Return to Blair City Hall parlor to Final Inap�ecti 218 S i6th street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not Interfere with reroofing work,please Indicate compliance with the following requirements f I,c Dgwina this reroofing Job. Property Address: Contractor or Homeowner(if self) Permit#: MS-20 t - , installation Date: .__._. —� Yy✓ NO {� ❑ The materials and methods of application used for rgcavering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ❑ ICE PROTECTION 1NSTA L.ED: An ice barrier that consists of at least two layers of undedayment or of a seif-adhering polymer modified bitumen sheet was instal nd extends at least turn the eaye's edge to a point at least 24 Inches inside.the exterior wall line of the building. (R905.2.7.'1) STRUCTURAL c WPONEEU AsRE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) Q EXISTING C VI=RI WAS REMOVED! Existing roof covering was removed for one of the reasons required by section R907.3 C3 }}IQ OT USERUSTw METAL OR S NG:--Existing vent flashing, metal edges, N �'�-�� #rusted. R947.6� drain outlets,dollars or metal counter-flashing were not reinstalled ( ( I FLA3H1 iNSTALt.ED P O ERLY: Flashing shat}be reconstructed in accordance ation Instructions. Metal which with approved manmaterials are to be adhecturers red bituminous ma shall be primed prior to Ins allation. (R9Q7.6) Date Signator Primary installer Date Signatur of e i Holder i