Checkoff Sheet MS-2014-01045.tif 200 9 INTERNATIONAL RESIDENTIAL CODE
CITY OF :BL,AIR, REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
RoA interfere with reroofing work,please Indicate compliance with the following requirements
f_ollowing this reroofing Job.
/ I
Property Address: � �_
Contractor or Homeowner(if self}: A - t A
Permit#: MS-20
installation Date;
s
Yed NO i
❑ The materials and methods of application used for r6covering or replacing the existing !
roof covering comply with the requirements of the building code. (11907.1)
❑ ICE PROTECTION INSTALLEQ:An lee barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was JosIgi
led and
extends_aj least front the cave's edce to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING CQVERING WAS_REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
(� DID N07 USE RUSTi a METAL OR FLASHINC3, Existing vent flashing,metal edges,
drain outlets,collars or metal counter-flashing were not reinstalled If rusted. (R907.6)
❑ FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions, Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907,6)
i
Signature lmary Installer Dai
L ___
Sign r ermit Holder Date
t ,
i
sf
l
I
i