Loading...
Checkoff Sheet MS-2014-01044.tif INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF C}FF SHEET Return to Blair City Hall prior to Final inspection 2'18 S '16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perro ede led Inspections following which requirements not Interfere with reroofing work, please indicate compliant followlnt this reroofing job. Property Address:_, f L66 � Contractor or Homeowner(if self) Permit#: NIS-20 Installation Date: f ---- .----- YEf Y1! NC? Q The materials and methods of application of�h�building coder.replacingthe existing roof covering comply with the red L`I ICI;PROTECTION NSTALLED:An ice barrier that consists of at ndleastst ns layers a d of uerlayment or of a self-adhering polymer modified bitumen sheet w s extends at least fromth .eaves edge to a point at least 24 inches insfde the exterior wall line of the building. (R905.2.7.1) [� $TRUCTU CO PONE TSA E SOUND;The structural roof componennts ioeds are capable of supporting the roof covering system and the material and equipment that wilt be encountered during installation of the roof covering system. (8907.2) EXISTOV . Existing roof covering was removed for one of the reasons required by section 11907.3 [� DID NOT USE RUS7E!D E L OI were Snot reinstalled f rus#ed metalting vent flashing, {F�907 edges, drain outlets,collars or metal counter-flashing (� LASHING INSTALLED PROPERLY: Flashing shall be e flashing nsucted to in which with approved manufacturer's installation instructions. Me bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Date Pr installer 4 Signature f older