Checkoff Sheet MS-2014-00975.tif 2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 16� Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would i
not Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: �r� � �i G c -ZN19
Contractor or Homeowner(if self)
Permit##: �017
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with.the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the cave's edge to a point at least 24 inches inside the exterior
wall lirie of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
( J ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation..(R907-6)
Sign r' l t I er at
Si f Per it-H er Date