Loading...
Checkoff Sheet MS-2014-00975.tif 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspection 218 S 16� Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would i not Interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: �r� � �i G c -ZN19 Contractor or Homeowner(if self) Permit##: �017 Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with.the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the cave's edge to a point at least 24 inches inside the exterior wall lirie of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) ( J ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation..(R907-6) Sign r' l t I er at Si f Per it-H er Date