Loading...
Checkoff Letter MS-2014-00734.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF-BLAIR. REROOFING CHECKOFF SHEET Return to Blair City Halt prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perforin detailed Inspections which would no A interfere with reroofing work,please Indicate compliance with the following requirements following this reroofing job. (� ,�1 Property Address: t 1 , r Contractor or Homeowner(if self) : R & ML ae✓ Permit#: MS-20_ � C� Installation hate: v� v No ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ❑ ! ST INSTALLED:An ice barrier that consists of at least two layers of ICE PROTECTION_ y A Y underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at leant from the eave's edges to a point at least 24 Inches in§iLthe exterior wall line of the building. (11905.2.7.1) STRUCTURAL COMPONENTS ARE SO ND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907.2) ❑ XiSTlNG CO _RING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT US„E RUSTrED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets,collars or metal counter-flashing were not reinstalled If rusted, (11907.6) CI FLASH,I„NQ INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (R9Q7.6) Signature P&e ler Date / �-�1 signature Date I