Checkoff Letter MS-2014-00734.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF-BLAIR. REROOFING CHECKOFF SHEET
Return to Blair City Halt prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perforin detailed Inspections which would
no
A interfere with reroofing work,please Indicate compliance with the following requirements
following this reroofing job. (� ,�1
Property Address: t 1 , r
Contractor or Homeowner(if self) : R & ML ae✓
Permit#: MS-20_ � C�
Installation hate: v�
v No
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
❑
! ST INSTALLED:An ice barrier that consists of at least two layers of ICE PROTECTION_ y A Y
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at leant from the eave's edges to a point at least 24 Inches in§iLthe exterior
wall line of the building. (11905.2.7.1)
STRUCTURAL COMPONENTS ARE SO ND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (11907.2)
❑ XiSTlNG CO _RING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT US„E RUSTrED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets,collars or metal counter-flashing were not reinstalled If rusted, (11907.6)
CI FLASH,I„NQ INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R9Q7.6)
Signature P&e
ler Date
/ �-�1
signature Date
I