Loading...
Checkoff Sheet MS-2014-01568.tif (tE f F 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF-BLAIR REROOFING CHECKOFF SHEET r Return to BlairCty Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. i E Property Address: Contractor or Homeowner(if self) Permit#: MS-20 -41 Installation Date: F YES NO The materials and methods of application used for-rdcovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) LN ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) �0 STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) bd EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTrED METAL OR FLASHING: Existing vent flashing, metal edges, or metal counter-flashingwere not reinstalled if rusted. 11907.5) drain outlets,Dollars ( �❑ FLASHING INSTALLED PROPERLY: C=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) f Si ure PH ry Installer Date r Sig a of Permit Holder Date r 4 t i I;