Checkoff Sheet MS-2014-03149.tif i
2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
Rot interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: to
Contractor or Homeowner(if self) : IvS` c� ►^
Permit#:
Installation Elate: 16 .-,2 :2 - 2-0 l
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply witli the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches ihs'ide the exterior
wall line of the building. (8905.2.7.1)
�
0 components are E TS ARE SOUND: The structural roof❑ STRUCTURAL COMP N N
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
�❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTED METAL,OR PLASHING: Existing vent flashing, metal edges,
drain outlets,collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation..(R907.6)
12-—2 ,
SIgnat9je of Primary I staller Date
8 6nit6re of Permit Holder Date