Checkoff Sheet MS-2014-01766.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF�BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 18 th Street, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements I
following this reroofing Job.
Property Address: -ty -
Contractor or Homeowner(if self)
Permit#: MS-20 a D 1"1 LP
installation Date:
I
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
extends at least from the eave's edge to a point at least 24 Inches Inside the exterior
wall line of the building. (R905.2.7.1)
�� ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
l�. ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (R907.5)
❑ PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's Installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R907.6)
22
htj,--
Slg a Primary Installer Date
Signature of Permit Holder Date