Loading...
Checkoff Sheet MS-2014-01766.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF�BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 18 th Street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements I following this reroofing Job. Property Address: -ty - Contractor or Homeowner(if self) Permit#: MS-20 a D 1"1 LP installation Date: I YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 Inches Inside the exterior wall line of the building. (R905.2.7.1) �� ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) l�. ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (R907.5) ❑ PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's Installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (R907.6) 22 htj,-- Slg a Primary Installer Date Signature of Permit Holder Date