Checkoff Sheet MS-2014-01685.tif 2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 96 Street, Blair, NB 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
aoA interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing Job.
Property Address:_ ' 0 Z o I(d � n r1,
Contractor or Homeowner(if self) :_ C— ,
i
Permit##: MS-20 -
i
- f
Installation Date; ,S -1 8' _Z° L/
YES NO
41" ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
�'" ❑ CCE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
extends at least from the eaye's-edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
I
❑ STRUCTURAL.COMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof cov6rirlg system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
F
of the reasons required by section 8907,3
❑ DID NOT USE RUSTED METAL.OR FLASHING: Existing vent flashing, metal edges,
drain outlets,.gollars or metal counter-flashing were not reinstalled If rusted. (R907.5)
❑ PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
With approved manufacturer's Installation instructions. Metal flashing to which G
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sig re of Primary Installer Date
G
Signature of Permit Holder Date
r
G