Loading...
Checkoff Sheet MS-2014-02482.tif 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair Cid Full prior to Final inspection 218 s le street, stair, NE 68008 0ecause of limitations caused by the infeasibility to perform dstaftd inspectlons which would not Interfere with reroofing work,pleaso indicate cumplianoe with the following req,uiremenfs fol winEt this reroofing job. Property Address: Y`� ' ''=• Contractor or Homeowner(if self Permit#: � fl�.�,'� ' Installation Vate- YES NO �7 "The materlals and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code- (R907.'1) I� ICE PROTECT[ON INSTALLED,An los barrier that consists of at least two layers of underiayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the aaye's•edge to a point at least 24 Inches Maids the oxterior wall Brie of the building. (11006.2.7,1) C3 a-rpUCTURAL COMPONENTS AR5�OUNDI The structural roof components are capable of supporting the roof oovbting system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) l KISTi O COVERIN—P WAS R moVED4 Pxlsting roof covering was removed for one of the reasons required by seotlon 8507.6 DID No-r USP RUST50 METAL OR FLASHING: r:Msting vent flashing, metal edges, drain outlets;Qollars or metal counter-flashing were not retnstalied if rusted. (R907.6) ` ❑ F� �,SH[NC iNSTALLI=Ia ltiaPli4Y: Flashing shall be reconstructed in accordance with appioved manufacturer's installation instructions.Metal flashing to which bituminous materials are to be adhered shall be primed prior to Instaliatlon.•(1807.6) Signa re o Pri Inst r Date 1 ' 1 Signature&f Permit Md6r date