Checkoff Sheet MS-2014-01253.tif E;
Dec. 29. 2015 11 : 16AM No. 0151 P. 4
2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAiR REROOFING CHECKOFF SHEET
Return to Bair City, Hali prior to Final Inspection
218 B X16 street, Blair, NB 08008
Because of limitations caused by tate infeasibility to perform detailed Inspectlons wNch would
no Interfere with reroofing work,please Indicate compliance with the following requirements
foiiowin this reroofing job.
Property Addrese:
Contractor or Homeowner(if Self): AW 81 `l Rbf4v,� A'S&t.12 .'ak 4 GGA'
Permit , MS-20 - LLaS-3
I
installation Data: ut` � 1
YF-3 NO
The materials and methods of application used for recovering or replacing the Wating
roof covering comply with the requirements of the building coda. (119071)
icE taROT 'ICTION INS'rP LLED;An ice battier that consists of at least two layers of
undedayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's•edge to a point at least 24 inches irisl'de the exterior
wall line of the building.(R005.2,7.1)
STRUCTURAL cOMpc)Ngt S�1j;'SDLIND: They stn tcfurel roof components are
.capable of supporUhg the roof cov6ft systeM and the material and equipment loads
that will be encountered during Installation of the roof covering system. (11807.2)
I, EXiSTINt31 COVERING WAS REMOVED.,Existing roof covering was removed for one
of the reasons required by section 8907.3
i
C L DID NOT USI;nts_Sjgp M fTAL OR SLASHING:Veting'vent flashing,metal edges,
drain outlets;goliars or metal counter-flashing were not retnstalled if rusted. (R907.5)
( d FLASHING INSTALLED OltopEFlashing shall be reconstructed in accordance.
with approved manutaoturer`s installation Instruotlons. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to instali$tlon.•(11907.6)
Signature of Primary Installer Date
Signature of Permit Heider gate