Loading...
Checkoff Sheet MS-2014-01251.tif E Dec• 29. 2015 11 : 16AM No. 0151 P. 2 2009 INTERNATIONAL RESIDENTIAL, CODE' CITY OF 13LAIR REROOFING CHECKOFF SKEET Return to Mair City, ball prior to Final Inspection 2'18 816 Street, Blair, NE 6$008 F 13ecause of limitations caused by the Infesalbllity to perform detailed Inspections which would 1 I o interfere with reroofing work,please indicate compiianco with the following requirements following this reroofing job. r Properfy Addreas: Contractor or Homeowner(if self} Q ba�-.�4 WA Permit& MBY201 L! (Diu,— Installation Di 7Instaliation Date; P-r-ebC) w- c�c,.3--e- YF-8 e- ' •car z�, za��"• • YJl~4A 0 C ' l The materials and methods of Applination used for recovering or rBplacing the existing roof covering comply wltli•the requirements of the building code. (11907.1) ICE PROTECTiON INSTALLED;An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modifled bitumen sheet was installed and extends M least from tha eave's•edge to a point at least 24 inches inside the exterior_ wail line of the building. (R905,2,7.1) r IT RUO`CUl3AL COJIPONFNTS C' h�alructural roof components are E capable ofsupportlhg the roof coving system and the material and equipment loads that will be encountered during Installation of the roof covering system.(x507,2) c F RN§j{NQ COVERING WAS REMOVED-,U' sting roof covering was removed for one of the reasons required by seotlon 8907.3 in -T USE RUWT Q METAL ORFLAMN0,415Wsting vent flashing,metal edges, drain outlets,roliars or matal cauntertflashing were not reinstalled If rusted. (8947.5) Q FLASHING iA ST LED Q - Y,Flashing shall be reconstructed In accordance With approved manufacturer's Installation Inatructlons.Metal flashing to which bituminous materials are to be adhered shall he pftad prior to Installation.,(11907.6) Signature of Primary Installer Date Slgnature of Permit Holder Date