Checkoff Sheet MS-2014-01251.tif E
Dec• 29. 2015 11 : 16AM No. 0151 P. 2
2009 INTERNATIONAL RESIDENTIAL, CODE'
CITY OF 13LAIR REROOFING CHECKOFF SKEET
Return to Mair City, ball prior to Final Inspection
2'18 816 Street, Blair, NE 6$008
F
13ecause of limitations caused by the Infesalbllity to perform detailed Inspections which would 1
I o interfere with reroofing work,please indicate compiianco with the following requirements
following this reroofing job.
r
Properfy Addreas:
Contractor or Homeowner(if self} Q ba�-.�4 WA
Permit& MBY201 L! (Diu,—
Installation
Di 7Instaliation Date; P-r-ebC) w- c�c,.3--e-
YF-8
e- '
•car z�, za��"• •
YJl~4A 0
C ' l The materials and methods of Applination used for recovering or rBplacing the existing
roof covering comply wltli•the requirements of the building code. (11907.1)
ICE PROTECTiON INSTALLED;An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modifled bitumen sheet was installed and
extends M least from tha eave's•edge to a point at least 24 inches inside the exterior_
wail line of the building. (R905,2,7.1)
r
IT
RUO`CUl3AL COJIPONFNTS C' h�alructural roof components are E
capable ofsupportlhg the roof coving system and the material and equipment loads
that will be encountered during Installation of the roof covering system.(x507,2) c
F
RN§j{NQ COVERING WAS REMOVED-,U' sting roof covering was removed for one
of the reasons required by seotlon 8907.3
in -T USE RUWT Q METAL ORFLAMN0,415Wsting vent flashing,metal edges,
drain outlets,roliars or matal cauntertflashing were not reinstalled If rusted. (8947.5)
Q
FLASHING iA ST LED Q - Y,Flashing shall be reconstructed In accordance
With approved manufacturer's Installation Inatructlons.Metal flashing to which
bituminous materials are to be adhered shall he pftad prior to Installation.,(11907.6)
Signature of Primary Installer Date
Slgnature of Permit Holder Date