1313 Maple dr elec.tif t..)ILDING INSPECTION REPORT
P) CITY OF BLAIR ❑ WASHINGTON COUNTY ❑OTHER
LOCATION OF INSPECTION: � 4_�I c�
b � °= � I
NAME OF OWNER:-"
- ; akm - .'�, PHONE#:
PERSON REQUESTING INSPECTION: PHONE#: A
0 SET TIME
DATE INSPECTION REQUESTED: r a TIME INSPECTION REQUESTED: OkNYTIME
PROJECT DESCRIPTION:
I
TYPE OF INSPECTION: ❑ IST INSPECTION ❑ RE-INSPECTION ❑ CONFERENCE ❑ STATUS CHECK
BUILDING: ❑FOOTING ❑DECK FOOTING [:]FRAMING ❑DRYWALL ®PARTIAL ❑FINAL PASSED FAILED
PERMIT NO.; CONTRACTOR: RECORDED: ❑ ❑
UTILITIES: ❑SEWER TAP ❑SEWER ❑SEPTIC DWATERTAP DWATERSERVICE ❑PARTIAL ❑FINAL PASSED FAILED
PERMIT NO.: CONTRACTOR: RECORDED; ❑ ❑
ELECTRICAL: ❑TROUGH IN ffWP.MANENT SERVICE ❑TEMPORARY SERVICa- P CONNECT ❑PARTIAL ❑FINAL PASSED EMfLE-D
PERMIT NO.: "� k _. I pCONTRACTOR: Y RECORDED: El
MECHANICAL: ❑ROUGH-IN ®A/C ❑ FURNACE ❑HEAT PUMP ❑FIREPLACE ❑ GEOTHERMAL ❑RADIANT HEAT PASSED FAILED
❑PARTIAL ❑FINAL ❑';, ❑
PERMIT NO.: CONTRACTOR: RECORDED:
PLUMBING: ❑GROUNDWORK ❑ROUGH M ❑PRESSURE TEST ❑PARTIAL ❑FINAL PASSED FAILED l
i.
PERMIT NO.: CONTRACTOR: RECORDED: ❑ ❑
❑OCCUPANCY GRANTED ❑CONDITIONAL OCCUPANC,,',GRANT ❑9ll SIGN ❑RETURN DEPOSITS ❑FORFEIT DEPOSIT
1-51
' y fc� .% '
NOTES/REMARKS: �r ., ., ._ _ ., :yqt AW
1
,r
I
r
_v
WASHINGTON CO.INSPECTOR,CITYTVSWCTOIM
ar
DATE OF INSPECTION: " � uiJ ❑❑ TIME:
EMAILED TO OPPD OR BCPPD 0 DATE: INITIALS:
E3