Loading...
Checkoff Sheet MS-2014-03344.tif NAL RESIDENTIAL 2009 INT CHECKOFF FF SHEETF �N G cH� cKO CITY L RR®® to �ina1 inspection Return to Blair C�Y Hall priorto N 68008 ' 218 S 16 Street, s ' to erform detailed inspections which would the infeasibility p Because of limitations caused KY lease indicate compliance with the following requirements not interfere with reroofing w ,p followln this reroofing job, � Property Address: � �, LL ��-Fina Contractor or Homeowner(if self) I its 2o_�y___� X33 I Permit#: � ��,• � installation Date: � �d YES NO licatton used for recovering or replacing the existing The materials and methods of app code. 8907.1) roof covering comply With the requirements of the building r . INSTALLED: An ice barrier that consists ofnee wa layers d ICE PROTECTION modified bitumen underlayment or of a self-adhering Polymer Dint at least 24 inches inside the exterior extends at least from the eave's e�to a p wall line of the bung. (8905.2.7.1) ONENTS ARE SOUND:The structural roof components are STRUCTURAL COMP s stem and the material and equipment loads capable of supporting the roof covbritig Y stem. (R907,2) that will of encountered during installation of the roof covering sy COVERING WAS REMOVED: Existing roof covering was removed for one EXISTING ction 8907.3 of the reasons required by se E RUSTED METAL OR FLASHING: Existing f rustede(R9 5)edges,tal DID NOT US were not reinstalled draln outlets, collars or metal counter-flashing LLED PROPERLY: Flashing shall be reconstructed��ich°rdance FLAn Instruct! SHING 1NSTAions. Metal with approved manufacturer's insfalelxaedO shall be primed prior to in (8907.6) bituminous materials are to be adhered ate SigngPulle of Primary I staller ate Sig a ure of Permit Holder