Checkoff Sheet MS-2014-03344.tif NAL RESIDENTIAL
2009 INT CHECKOFF FF SHEETF
�N
G
cH�
cKO
CITY L RR®® to �ina1 inspection
Return to Blair C�Y Hall priorto
N 68008 '
218 S 16 Street, s
' to erform detailed inspections which would
the infeasibility p
Because of limitations caused KY lease indicate compliance with the following requirements
not interfere with reroofing w ,p
followln this reroofing job,
�
Property Address: � �, LL
��-Fina
Contractor or Homeowner(if self)
I
its 2o_�y___� X33 I
Permit#: � ��,• �
installation Date:
� �d
YES NO licatton used for recovering or replacing the existing
The materials and methods of app code. 8907.1)
roof covering comply With the requirements of the building
r .
INSTALLED: An ice barrier that consists ofnee wa layers
d
ICE PROTECTION modified bitumen
underlayment or of a self-adhering Polymer Dint at least 24 inches inside the exterior
extends at least from the eave's e�to a p
wall line of the bung. (8905.2.7.1)
ONENTS ARE SOUND:The structural roof components are
STRUCTURAL COMP s stem and the material and equipment loads
capable of supporting the roof covbritig Y stem. (R907,2)
that will of encountered during installation of the roof covering sy
COVERING WAS REMOVED: Existing roof covering was removed for one
EXISTING ction 8907.3
of the reasons required by se
E RUSTED METAL OR FLASHING: Existing f rustede(R9 5)edges,tal
DID NOT US were not reinstalled
draln outlets, collars or metal counter-flashing
LLED PROPERLY: Flashing shall be reconstructed��ich°rdance
FLAn Instruct!
SHING 1NSTAions. Metal
with approved manufacturer's insfalelxaedO shall be primed prior to in
(8907.6)
bituminous materials are to be adhered
ate
SigngPulle of Primary I staller
ate
Sig a ure of Permit Holder