Checkoff Sheet MS-2014-02772.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair y CitHall prior to Final Inspection
218 S 16th street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
not Interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing job.
Property Address:
contractor or Homeowner(if self) :
Permit#:
installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
w. ICE PRaTECTION LED: An ice barrier that consists of at least two layers of
underlayment or of a self-aFhering polymer modified bitumen sheet was Installed and
extends at leas to a point at least 24 Inches Inside the exterior
wall line of the building, (R906.2,7.1)
STRUCTURAL COMPONENTSARPSOUND:The structural roof components are
capable of supportihg the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REIVIOM : Existing roof covering was removed for one
of the reasons required by section 89.07,3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (11907.6)
PLASHING INSTALLED_PROPERLY- Flashing shall be reconstructed In accordance
with approved manufacturers installation Instructions, Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (8907.6)
I tu of Primary Installer Date
Date
Signature of Permit Holder