Loading...
Checkoff Sheet MS-2014-01574.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF;BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 1611 street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not Interfere with reroofing work,please Indicate compliance with the following requirements fq!!2K1M this reroofing job. Property Address: UIS Witt� ' Contractor or Homeowner(if self) Permit M, Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907,1) I ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of t unZria;meZor of a self-adhering polymer modified bitumen sheet was Insailed and extends ais least from the eave's-e-dA-e to a point At least 24 Inches inside the exterior wall line Of the building, (8905,2.7.1) dL C1 STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system, (8907 1.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets,collars or metal I counter-flashing were not reinstalled If rusted, (8907,5) FLASHING INSTALLED PROPERLY:,Flashing shall be reconstructed In accordance with approved manufacturers Installation Instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (8907.6) Oture oltrllm� Date Signaiure of Permit Holder Date