Checkoff Sheet MS-2014-01143.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 518 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not Interfere with reroofing work,please Indicate compliance with tho following requiremenfats
foliowin this reroofing job. 01
Property Address: N
contractor or Homeowner(if self)
Permit#: NfS20 L :
Installation Date:
YES NO
The materials and methods of application used for,recovering or replacing the existing
roof covering comply with the requirements of the building code, (8907.1)
ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
,t 24 Inches Inside the exterior
extends at leas to a point at leas
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (R907.2)
rl EXISTING COVERING REMOVED: Existing roof covering was removed for one
_N
of the reasons required by section R907.3
M DID NOT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted, (R907.6)
FLASHING-INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions, Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation, (8907.6)
installer 4slgai of-Pri'mary In Date
Signature of Permit Holder Date