Loading...
Checkoff Sheet MS-2014-01130.tif 14-11 ) 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final in 218 S 16t' street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please Indicate compliance with the following requirements followin!a this reroofing job. Property Address: t Contractor or Homeowner(if self) : Kermit MS-20_LL _11t5_0_, Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was_Installed and extends to a point at least 24 inches inside the the exterior wall line of the building, (R906.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are material and equipment loads capable of supportihg the roof covering system and the that will be encountered during Installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING* Existing vent flashing, metal edges, drain outlets,collars or metal counter-flashing were not reinstalled If rusted, (R907.6) FLASHING INSTALLED PR_OPERLY,. Flashing shall be reconstructed in accordance -.with approved manufacturer's Installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installatlon. (8907.6) Date �g*4e of FrImM Installer Signature of Permit Holder Date