Loading...
Checkoff Sheet MS-2013-00481.tif i 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF 13LAIR REROOFING CHECKOFF SHEET Retum to Blair City Hall prior to Final Inspection 18 S le street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would aoA interfere with reroofing works please indicate compliance with the following requirements follqMft this reroofing job. Property Address: ' 1 3 PrA i ry ('i V Z . Contractor or Homeowner(if self): MC inn Permit#: MS-203 - d G L/ g Installation Rate: YES NO (�❑ •'The materials and methods of application used for recovering or replacing the existing • roof covering comply with the requirements of the building code. (11907.1) LK ❑ iCE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches insrde the exterior wall Ilse of the building. (R905.2.7.1) �® STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporUhg the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907.2) L� ❑ EXISTING COVERING WAS REMOVED:Bdsting roof covering was removed for one of the reasons required by section R907.3 ® piD NOT USE RUST91)METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets,goilars or metal counter-flashing were not reinstalled if rusted. (R907.5) j ❑ FLASHING INSTALLED PROPERLY:Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions.Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation.•(R907.6) /a- �SAIs Signa rlmary installer Date Signa o ermit Holder Date j