Loading...
Checkoff Sheet MS-2014-03173.tif 12/15/2015 07:25 4029914929 KRT CONSTRUCTION PAGE 02/02 2009 r CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City. Hall prior to Final Inspection 2i 8 s W street, slair, NE 68008 gecause of limitations caused by the Infeasibility to perform detailed inspections which would po interfere with reroofing work,please indicate compliance With the following requirements ailowin this reroofing bola. PropeM Address: (o' Contractor or Homeowner(If self) L Perm it#: InstallatiAn_0ate. YES NO The materials and methods of appilcation used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) 13 IC5 MTECTION INSTALLED'An Ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen shest wa0pst_lied-and extends at least from the eaye's ed a to a point at least 24 inches-In,44t110 exterior wail Brie of the building. (11905.2.7.1) STRUC�'URAI.CC)Mp0f4EN`I• ARS SOtlND:The structural roof components ar® capable of supporting the roof covkring system/and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) ggi''ING+0011'1=RIl{ G INAS REMOVED:Existing root'covering was removed for one of the reasons required by seotlon 8907,3 FJII]NO USIA k US'i'I Q I1 ETAL OR pLASHING115xisting vent flashing, metal edges, drain outlets, gollars br Metal g . counter- ash[ng were not reinstalled if rusted, (R 7-5) PLASIII CIN TAI-LI=a PRop r=RLY: Flashing shall be reconstructed In accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installaflon. (R907.6) i $ u ra o Primary Irl ler Date Sign re of Permit Holder to i