Checkoff Sheet MS-2015-00471.tif 12/05/2015 SAT 11: 14 FAX 0006/006
2009 INFERNATIONAL RESIDENTIAL CODE
CITY OF BLAIRREROOFING H{ F SHEET
Return to Blair City Hall prior to Final Inspection
� 3 218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work,please indicate compliance with the following requirements
followfn this reroofing job.
Permit#:
�--
Installation Date::
YES NO
{ The materials and methods of application used for recovering or replacing the existing
roof covering comply l with the requirements of the building code. (8907.9)
p
ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underiayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed e to a point at least 24 inches inside the exterior
wail line of the building. (11905,2.7.9)
( STRUCTURAL COMPONENTS ARE S0UND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED,METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PRO PI~RLY- Flashing shag be.11 reoonst,r.Wed in accar ance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Sig re of Primary In taller Date
i
i nature of Permit Holde D
' I
i
• i