Loading...
Checkoff Sheet MS-2014-00669.tif i 12/05/2015 SAT 11: 11 FAX 0002/006 INTERNATIONAL2 2009 CITY BLAIR REROOFING CHECKOFFSHEET � Return to Blair City Hall'prior to Final Inspection 218 Sl6 Street, Blair, NB 68®8$ Because of limitations caused by the infeasibility toperform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follow'ing this reroofing job. hermit#: ` Installation Date: - - YES/ ES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 1 ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of / underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 244 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) 0 EXISTING COVERING WAS REMOVED., Existing roof•covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL" OR FLASHING: Existing Ment flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) 4 ❑. FLASHING INSTALLED PROPERLY: Clashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) /ZA 4/�' Signaf a Primary Installer ate Date Signature of Pe It Holder �