Loading...
Checkoff Sheet MS-2014-00444.tif i I 2UUU INTERNATIONAL. � .l E_ . VAL CODE CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final inspection 218 S 1t Street, Blair, NE 68001 ]Because of limitations caused by the infeasibility toerfo ons which not interfere with reroofing work,piease indicate compliance tailedwith theinsfollowiing requir mentsd WmIM this reroofing job. / Properly Address; /`7 Contractor or Homeowner(if self):--gievef'fZc �yr7 ' hermit##. MS-20 C� � Installation.Data,,, _ 0/4 — VIES, /4 •VIS N6 I 'The materials and methods of appilcalton used for recovering or replacing the existing roof cavarfng comply with tie requirements of the building code. (R907.1) 1 ' ICE PROTECTION INSTALLED;An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was I�and extends at least from the save's edge to a point at least 24 inches fns►de the exterior wall line of the building. (R90627.1) STRUCTURAL COMPONENTS ARE SQUND:The structural roof components are capable of supporting the roof covb t7g system and the:material and equipment loads that will be encountered.during Installation of the roof covering system. (8,907,2) l EXISTING COVEPING WAS REMOVED.E dsting root covering was removed for one of the reasons required by sectlon :907,3 DID NOT iLSE RUST*MF-rAL OR ELASHINR:Exlating vent flashing, metal edges, drain outlets, go1fars or metal mounter fashIno were not reinstalled if rusted. (R907.5) FLASHING INSTALLED,PROPERLY., Flashfng shall ba reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation.-(R907.6) Signature of primary Inst [e pate SI attire of Pe I Molder T Date i