Checkoff Sheet MS-2014-03215.tif i
12/05/2015 SAT 11: 12 FAX 0004/006
2009 INTERNNATI"N 'l L "M
QTYOF L I IN
Return to Blair City Hall.prior to Final inspection
218 S 16th Street, Blair, NB 68408 A
Secaus
e of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work,please indicate compliance with the following requirements
followin this reroofing job.
Permit#:
Installation date: _ ^-----
YES NO
The materials and methods of application used for recovering or replacing the existing
q
roof covering comply
with the requirements of the buiiding code. (R907.1)
ICE PIZOTECT[ON INSTALL EL7:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at feast from fhe eave's ed e to a point at leaexterior
wail line of the building. (R905,2.7.1)
STRUCTURAL.COMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system.(R907.2)
EXISTING COVERING WAS REMOVED:Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTEb METAL OR FLASHINGx Existing vent flashing, metal edges, drain
outlets,collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
. FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sig t4 e of Primary InstalI4 Date
Date
Signatu e f Permit Holder
I
I
I