Loading...
Checkoff Sheet MS-2014-02393.tif 12/07/2015 MON 12: 11 FAX 2001/001 2009 INTERNATIONAL RESIDENTIAL CODE , CITY OF BLAIR REROOFING CHECKOFF T r A j� k Return to Blair Ci y Hall prior to Final Inspection 218 i6 Street, Blairs NE 6800.8 � ' Because of limitations caused by the infeasibility to perl'orm detailed inspections which would not interfere with reroofing work,please indicate compliance with the following requirements follow"in this reroofing job. Permit#: �� _42D 1 3 Installation Date.: YE,5 NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907,I) [� ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of aself-adhering polymer modified bitumen sheet was installed and a point at feast 24 inches extends at least:from the eaye's edge to s inside the exterior wall line of the building. (R905.2.7.1) STRUGTUTAI.COIVIPON>"NTS ARE SOUND:The the material and structural roof components are equipment loads capable of supporting the roof covering system and h that will be encountered during installation of the roof covering system, (8907.2) EXISTING COVERING WAS REMOVED: Existing roof•covering was removed for one ' of the reasons required by section R907.3 (� ND DUSTED METAL OR FLASHING: Existing vent flashing,metal edges,drain outlets, collars ar metal counter-flashing were not reinstalled if rusted. (8907.5) I [�. PLASHING iNSTALIrE©PROla1;RLY. Flashing shall be reconstructed in actor arise with approved manufacturer's lnsch tallatlon instruectioinsa eriorftoinstallation hing to i (8907.6) ail b p bituminous materials are to be adhered sh p } gate I ature f rimary Install r Signatu e of P Date ermit Holder