Loading...
Checkoff Sheet MS-2014-00535.tif 12/05/2015 SAT 11: 13 FAX 1005/006 2009 tOWEN' IAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall'prior to Final inspection 4 218 s'i(ith Street, Blair, NE 6800.8 Because of limitations caused by the infeasibility to'perform detailed lnspectlon ch would not interfere with reroofing work,please indicate compliance with the following requirements foilowin this reroofing job. Permit Installation Date: YES No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907,1) ICE PROTECTION INSTALLED;An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was i�nstallgd and extends at least from the eaves edge to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) I STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting ortin the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I EXISTING COVERING WAS REM0- VED: Existing roof covering was removed for one / of the reasons required by section R907.3 (� NO RUSTED METAL, OR FLASHING: Existing vent flashing,metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5) I ( PLASHING IN PROPERLY: Flashing shatl be reconstructed in accordance / with approved manufacturer's installation instructlans. Metal flashing to which bituminous materials are tv ba adhered shall be primed prior to Installation. (R907.6) ysl/ature of Primary I alley Date 081natu—re of Permit Ho! er Date U k 6 j�J