Loading...
Checkoff Sheet MS-2014-00181.tif i 12/05/2015 SAT 11: 10 FAX 2001/006 CODE ,L RESIDENTIAL 2009 INTERNAI UNA ITEC OF BLAIRIN H EET Return to Blair City Half prior to Final inspection 218 S 16thStreet, Blair, NE 68008 caused b the infeasibility to'perform detailed inspections which would Because of limitationsY not interfere with reroofing work,pioase indicate compliance with the following requirements folCaw'in this reroofing job, Permit#• p i i Installation ©ate: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907-1) i ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge_to a point at least 24 inches inside the exterior wall line of the building. (R905,2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) EXISTING CQVERiI C WAS REMOVE©: Existing roof'covering was removed for one ' of the reasons required by section R907.3 I� NO RUSTED !METAL OR FLASHING; Existing vent flashing,metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) J� d. FLASHING INSTALLED PROPERLY. dashing shall be reconsfructed iri accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,6) Signa re ofAdlimary p to I .� p e Signatur of ermit Holder i i i