Checkoff Sheet MS-2014-00180.tif 12/05/2015 SAT 11: 12 FAX 2003/006
I
2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR ®FIN KSHEET
Return to Blair City Hall'prior to 'Final inspection
218 S'16" Street, Blair, NE 68008
Because of limitations caused by the infeasibility to,perform detailed inspections which would
not;interfere with reroofing work, piease indicate compliance with the following requirements
fallow'in this reroofing job. p
Permit#:
Installation date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907J)
Q ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed g to a point at least 24 Inches inside the exterior
wail line of the building. (R905.2.7.1)
STRIIGTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
NO RUSTED METAL O FLASHING: Existing � inetal edge$, drain
outlets, collars or metal
�u�ea �ngwere ofi renstailed if rusted, (8907.
FLASH INSTALLED P OPIRLY: FEashing shall be reconsfiructed in accordance
with approved rnanufac#urar's Ins#allatiorti instructions. Metal fEashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature o unary ins aper Date
Signature of ermit Holder D to