Loading...
Checkoff Sheet MS-2014-00180.tif 12/05/2015 SAT 11: 12 FAX 2003/006 I 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR ®FIN KSHEET Return to Blair City Hall'prior to 'Final inspection 218 S'16" Street, Blair, NE 68008 Because of limitations caused by the infeasibility to,perform detailed inspections which would not;interfere with reroofing work, piease indicate compliance with the following requirements fallow'in this reroofing job. p Permit#: Installation date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907J) Q ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed g to a point at least 24 Inches inside the exterior wail line of the building. (R905.2.7.1) STRIIGTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL O FLASHING: Existing � inetal edge$, drain outlets, collars or metal �u�ea �ngwere ofi renstailed if rusted, (8907. FLASH INSTALLED P OPIRLY: FEashing shall be reconsfiructed in accordance with approved rnanufac#urar's Ins#allatiorti instructions. Metal fEashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature o unary ins aper Date Signature of ermit Holder D to