Loading...
Checkoff Sheet MS-2014-02254.tif RESIDENTIAL CODE* CITY L IR REROOFIN.G CHECKOFFT Return to Blair City Hall prior to Final Inspection _ 218 S le Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would no Interfere with reroofing work,please Indicate compliance with the following`requirements foliowin this reroofing job. , Property Address: 3 Contractor or Homeowner(if self) Permit#: MSWAZ0 )J--1 02,ZS I Installation Date:, Io bb YEP NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) i ICE PROTECTION INSTALLED:An Ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at least from the eave's-edge to a point at least 24 inches Inside the exterior wall line of the building.`(R905,2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) j=XISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTIC`©METAL OR PLASHING:Existing vent flashing,metal edges, draln outlets,collars or metal counter-flashing were not reinstalled If rusted. (R907A) PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed In accordance with approved manufacturer's Installation instructions.Metal flashing to which bituminous materials ars to be adhered shall be primed prior to Installation.•(R907.6) `Signature of rimary Installer Date i 12yIS Signa a of Pan-nit Halder Date