Checkoff Sheet MS-2014-00291.tif i
Nov. 30. 2015 12:35PM No. 4122 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE
BLAIR REROOFING CHECKOFF SHEET
Return to t iti y, Miall prior to Final Inspection
8 8 1 tract, Blair, NE 65008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
An interfere with reroofing work,please Indicate compliance with the following requirements
following this reroofing job.
r
Pro a -Address:
Contractor or l-Iomeowner(if self) :
Installation hate: --
YES MO
The materials and methods of application used for recovering or replacing the existing
roof covering oomplywlth the requirements of the building {code. (11907.1)
101; l?ROTgCTION INSTALLEb:An Ice Farrier that consists Of at least two layers of
underlayment or of a sell adhering polymer modified bitumen sheet was Installed and
extends at least from the eave's edge to a point at least 24 inches Inards the exterior
wall line of the building. (8905.2.7.1)
STRUGTURAI<COMPONENTS AR SOUND'The,structural roof components ere
capable of supportlhg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
rl EXISTING COVERiNG WAS PEEZ18ting roof covering was removed for one
of the reasons required by section Rg07.3
Il)NOT USE RUST03 METAL OR FLASHING: Imxlsting vent flashing, metal edges,
dram outlets,Qollars or metal counter-flashing were not relnsfallod If rusted. (R907.5)
FLASHING INSTALLED PROPERLY:.Flashing shall be reconstructed In accordance
with approved manufacturer's Installation instructions. Metal flashing to which
I7ltuminous erlals are to be adhered shall be primed prior to Installation.•(R9O7.5)
1�
Signatu Prl Inst lei • ( Date
Signa re of PFr14 older bate
i
i