Loading...
Checkoff Sheet MS-2015-00187.tif i I I I 12/02/2015 13:46 FAX 4025332173 10001/001 i REROOFINGCITY OF BLAIR Return to lairqty all prior to Final Inspection 2'18 'I Street, Blair, NE 68008 because of llmitation$caused by the Infeasibility to perform Walled Inspections which would no Interfere with reroofing work,please Indlcate compliance with the following requirements following this reroofing job. , Property,4ddressR '� --� [contractor or Homeowner(if self) Permit#: MS-20 __0 , Installation pate;_ YES NO 'qhs materials and methods of application used for recovering or replacing the existing roof covering comply wlt4 the requirements of the building cbde. (R807.1) ICE PROTECTION INSTALLED:An toe barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen shoet was Installed and extends t least from the eave's edge_to a point at least 24 Inche_sbside the exterior wall lige of the building, (8905.2.7.1) -a-rpU0TURAl..,C0MPQNENj8 ARE 54 d:The structural roof components are capable of suppoFUhU the roof cov6dng system and the material and equipment loads that will be encountered during installation of the roof covering system. (8007.2) I {l3TlNo S MERING V, l 1�11l QKED: Existing roof covering was removed for one of the reasons required by section R907.3 DID mo USE RUS gp META.0 FLASHI GEAsting vent flashing, metal edges, drain outlets,gollars or metal counter-flashing were not reinstalled If rusted. (8907.5) FLASHING iNST LLEa PROPERLY':.Flashing shall be reconstructed in accordance with approved manufacturer's Installation Instructions. Metal flashing to which Bituminous materials are to be adhered shall be primed prior to Installation.,(R907.8 n a of Primary Installer Date Signa urs of Permit Molder Cate I