Loading...
Checkoff Sheet MS-2015-00086.tif i 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair Ci all prior to Final Inspection _ 2'10 16 treet, . .lair, NE 66000 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: { rte/ 6 /A -fie Contractor or Homeowner(if self) e � Permlt g: „20 - c 96. Installation bate; YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7,1) STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable ofsupporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) . I EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5) j PLASHING INSTALLED PROPERLY; Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which uminou aterials are to be adhered shall be primed prior to installation..(8907.6) Ale g tune f r s ler Date ature bate i