Loading...
Checkoff Sheet MS-2015-00010.tif 2009 INTERNATIONAL RESIDENTIAL CODE, CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final Inspection As- 218 S 1Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work,please indicate compliance with the following requirements following_this reroofing job. Property Address: 'Jk Contractor or Homeowner(if self) : � ���� i i Permit#: MS-20 _ L1 Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with•the requirements of the building code. (R907.1) • I ❑ ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall lirie of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 0907.3 i DID NOT USE RUSTED METAL.OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation..(R907.6) • I Signature of Primary Installer Date � ature of Permit Holder Date v