Checkoff Sheet MS-2015-00010.tif 2009 INTERNATIONAL RESIDENTIAL CODE,
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Final Inspection
As-
218 S 1Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work,please indicate compliance with the following requirements
following_this reroofing job.
Property Address: 'Jk
Contractor or Homeowner(if self) : � ����
i
i
Permit#: MS-20 _ L1
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with•the requirements of the building code. (R907.1)
• I
❑ ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall lirie of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 0907.3
i
DID NOT USE RUSTED METAL.OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation..(R907.6)
• I
Signature of Primary Installer Date
� ature of Permit Holder Date