Loading...
Checkoff Sheet MS-2014-03027.tif 06/19/2011 21: 05 18167349968 JS CONSTRUCTION PAGE 01/02 CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 8 "t th Street, Blair, NE 68008 Because of limitations caused by the infeasibility for perform detailed Inspeatlons which would Lot interfere with reroofing work, please indicate compliance with the following requirements followla this-reroofing job. Property Address; lggq C549tIX - Contractor or Homeowner (if self) : Kermit MS-2014- 2-7 Installation Date: 1 i YES NO The materiels and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code:, (11907.1) ICE PROTr=GTION INSTALLED:An ice barrier that consists of at feast two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a paint at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) STRUCTURAL COMI?ONENTS ARE SOUND: The structural-roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907,2) EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL, OR FLASHING: Existing verit flashing, metal edges, I drain outlets, collars or metal counter-flashing were-not reinstalled if rusted, (8907.0) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which i inous materials are to be adhered shall be primed prior to installation. (8907.6) r r I taller make i rarrmltHolder bate