Checkoff Sheet MS-2014-01976.tif i
06/1912011 21:05 18167349968 J5 CONSTRUCTION PAGE 02/02
2009 INTERNATIO'NAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Retum to Blair City i
218 S 16th Street, Blair,, NE 68008
BOCause of lir"Itations caused by the ffiftasibility to perfom detailed Inspe6tions which would
noj Ince re with reroofing work, please indicate compliance with the following requirements
f2lipwing tale•reroofing.lois►,
r s^( f t/,
Property Address:
Contractor or Homeowner(if saif) :. J
Permits: Y 11?7
Installation late: .. .
i
YES NO
The materials and methods of application used for rewvering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point a�least 24 inches inside the exterior
wail line of the building. (11905.2.7,1) `
S'f i„M TURAL GO Pt}N�NTS ARESOUND; The structural-roof components are
gable of supporting the roof covering,system and the material acid equipment loads
that will be encountbred during installation of the roof covering system. (11907.2)
-;MISTING DOVE1111NG_WA „REMOVED: Existing roof covering was removed for one
of the r+easims required by section 8907.3 `
DID N_]T USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing warm not reinstalled if rusted. (R907.6)
FLASHING INS A►LLI;p PROPERL : Flashing shall be renonstmcted in accordance
with approved manufacturer's installation Instructions, Motal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Sig ure P In er at
f .
Sign re o rt Alder Date