Loading...
92-9_0001.tif I HEREBY ATTEST THAT THE FOLLOWING TEST REQUIREMENT ON THE 2 PSIG GAS PIPING SYSTEM AT: S REET r CITY STATE HAS BEEN MET OR EXCEEDED: "PRIOR TO THE INSTALLATION OF ANY FUEL LINE OR APPLIANCE REGULATORS, CAP AND SEAL THE PIPING SYSTEM(S), AND TEST WITH AIR AT A PRESSURE OF 10 PSIG FOR AT LEAST 30 MINUTES. AFTER COMPLETION ON THE AIR TEST, INSTALL THE NECESSARY REGULATORS AND SOAP TEST ALL CONNECTIONS FOR LEAKAGE." CONTRACTO INSTALLER DATE i �; V i Black Hills Energy TM Impwangbfewithmffgy FORM 48-0151(8/14)