92-9_0001.tif I HEREBY ATTEST THAT THE FOLLOWING
TEST REQUIREMENT ON THE 2 PSIG GAS
PIPING SYSTEM AT:
S REET
r
CITY STATE
HAS BEEN MET OR EXCEEDED:
"PRIOR TO THE INSTALLATION OF ANY FUEL
LINE OR APPLIANCE REGULATORS, CAP AND
SEAL THE PIPING SYSTEM(S), AND TEST WITH
AIR AT A PRESSURE OF 10 PSIG FOR AT LEAST
30 MINUTES. AFTER COMPLETION ON THE AIR
TEST, INSTALL THE NECESSARY REGULATORS
AND SOAP TEST ALL CONNECTIONS FOR
LEAKAGE."
CONTRACTO
INSTALLER
DATE i �; V
i
Black Hills Energy
TM
Impwangbfewithmffgy
FORM 48-0151(8/14)