Loading...
Checkoff Sheet MS-2014-00916.tif 2009 INTERNATIONAL RESIDENTIAL i I7Y OF BLAIRFIN F SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not Interfere with reroofing work,please Indicate compliance with the following requirements following this reroofing job. Permit#: /W5-;kQlq -6()9 ICP Installation Date: 'I"5-07 0l YEg NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) CI ICE PROTECTION INSTALLED:An Ice barrier that consists of at least two layers of underloymeni or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed-ge to a point at least 24 inches inside the exterior wall line of the building.(R905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system.(R907.2) ® . -EXISTING COVERING WAS REMOVED:Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING. Existing vent!lashing,metal edges, drain outlets,kcollars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING IhISTALLED PROPERLY: Flashingshall be reconstructed in accordance ordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sig of P' ary Installer Date i Slgna!pr6 of Permit Holder Date i