Loading...
Checkoff Sheet MS-2014-01448.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF-,BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection M S 16th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing work,please Indicate compliance with the following requirements foliowin this reroofing job. Property Address: —C) Contractor or Homeowner(if self) Permit#-. MS-2OLLL-7 C z �A Installation Date: YES 4 The materials and methods of application used for-rdeovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION -LE :An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was_Installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND* a The structura roof components re capable of suppoffthg the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) COVERING WAS REMOVED Existing roof covering was removed for one of the reasons required by section 8, 9.07.3 QlQ NOT USE l2US�"ED METAL OR FLASHING, Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.6) FLASHING INSTALLED PROPERLY-,-Flashing shall be reconstructed in accordance with approved manufacturer's Installation Instructions. Metal flashing to which b bi minous materials are to be adhered shall be primed prior to installation. (8907.6) I minous of P im I Dat �Siignature of m Installer rViv il onMaTur;—of—pe—rrl't—Hol—der Dat