Loading...
Checkoff Sheet M5-2015-00808.tif i a ,i 2009 INTERNATIONAL ESI . = NIL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would j not interfere with reroofing work,please indicate compliance with the following requirements followltin this reroofing job. Permit#: M ,,ag CDc) ydR i Installation Date: I YE§r NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 1 LJ ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are ! capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets,collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Sign&6 of Pr' ary Installer Date Signal,ir6 of Permit Holder Date