2009 INTERNATIONAL ESI . = NIL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would j
not interfere with reroofing work,please indicate compliance with the following requirements
followltin this reroofing job.
Permit#: M ,,ag CDc) ydR
i
Installation Date:
I
YE§r NO
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
1
LJ ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (11905.2.7.1)
Q STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are !
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
®
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets,collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Sign&6 of Pr' ary Installer Date
Signal,ir6 of Permit Holder Date