Checkoff Sheet M5-2015-00451.tif i
2009 INTERNATIONAL RESIDENTIAL CODE
Y OF BLAIR REROOFING CHECKOFF SHEET
i
Return to Blair City Hall prior to Final Inspection
218 S 16th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work,please indicate compliance with the following requirements
followin-g this
(�reroofing
�job. �
Permit f1: i t 1,t D`tJ�
Installation Date:
YES' NO
I ® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (13907.1)
ICE PROTECTION INSTALLED:An ice baffler that consists of at least two layers of
underlaymeni or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (11905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8007.2)
® EXISTING COVERING WAS REMOVED: Existingroof covering was removed for one
9
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existingvent flashing, metal edges, drain
9
outlets,collars or metal counter-flashing were not reinstalled if rusted, (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
/A" J0 l a l
Sign&K' of Pr' ary Installer Dale
SIgna!Pr6 of Permit Holder Dale