Loading...
Checkoff Sheet M5-2015-00451.tif i 2009 INTERNATIONAL RESIDENTIAL CODE Y OF BLAIR REROOFING CHECKOFF SHEET i Return to Blair City Hall prior to Final Inspection 218 S 16th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work,please indicate compliance with the following requirements followin-g this (�reroofing �job. � Permit f1: i t 1,t D`tJ� Installation Date: YES' NO I ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (13907.1) ICE PROTECTION INSTALLED:An ice baffler that consists of at least two layers of underlaymeni or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND:The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8007.2) ® EXISTING COVERING WAS REMOVED: Existingroof covering was removed for one 9 of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existingvent flashing, metal edges, drain 9 outlets,collars or metal counter-flashing were not reinstalled if rusted, (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) /A" J0 l a l Sign&K' of Pr' ary Installer Dale SIgna!Pr6 of Permit Holder Dale I i