Loading...
Checkoff Sheet MS-2014-01999.tif Oct 28 15 08:35a Legendary Homes,LLC 402-763-8581 p.1 2009 INTERNATIONAL RESIDENTIAL CODE BLAIR REROOFING CHECKOFF SHEET return to 13fair City Hall prior to Final inspection 218S16 thStreet, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work,please indicate compliance with the following requirements following this reroofing job. Property Address; '144-516' o Contractor or Homeowner(if self)*.` Z-3-4!f'Ca.�s l„ d , k L c Perrnit#u: MS-20�_� Installation Date;_ AL-'< � F- YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) C3 ICE PROTECT[ON INSTALLED:An Ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall lige of#ha building. (8905.2,7.1) STRUCTURAL COMPONENTS ARE SOUND:The-structural roof components are capable of supporting the roof covbring system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTENG COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE RUST5D METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-hashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be printed prior to installation.-(R907.6) G "aturearyInstaller Date Sl nature of Permit Holder p to ' I i